Electrical is energized

Getting future ready. Big step, lots of time, electrical panel is lit. I had no idea that it would take most of the weekend, however it was an important step in construction. I successfully got power from the subpanel (which is where the trenched wire from the main service panel used to terminate) at the […]

Read More Electrical is energized

Insulation and sealing

It was such a nice weekend that I hated to be inside much. But I have to do what is next on the list. I managed to get shims between some of the container bottom rails and the middle piers (since the bottom rails are a little more elevated than the corners). This helps stabilize […]

Read More Insulation and sealing

Weatherproofing and structural

The weather was pretty poor the week after the containers were set. Fortunately I was able to get the bridge clamps installed, even in the rain. These add to the structural integrity of the project. Clamps like these are what keeps the containers from toppling when the ships have run aground carrying these stacked 8 […]

Read More Weatherproofing and structural

Proof of concept

So my last post was about figuring out a solution to some challenges. Little did I know that the elevation change would be the least of my worries. Because the house is being built where the slope levels out nearer to the water, the ground stays really soft. The piers / pilings go past this, […]

Read More Proof of concept